文库网
ImageVerifierCode 换一换
首页 文库网 > 资源分类 > DOC文档下载
分享到微信 分享到微博 分享到QQ空间

《医疗机构消毒技术规范》 (2).doc

  • 资源ID:3213760       资源大小:56.50KB        全文页数:11页
  • 资源格式: DOC        下载积分:10文币
微信登录下载
快捷下载 游客一键下载
账号登录下载
三方登录下载: QQ登录 微博登录
二维码
扫码关注公众号登录
下载资源需要10文币
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
支付方式: 支付宝    微信支付   
验证码:   换一换

加入VIP,免费下载
 
账号:
密码:
验证码:   换一换
  忘记密码?
    
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

《医疗机构消毒技术规范》 (2).doc

1、. Building engineering biddingAbstract: Nowadays in the engineering construction industry, the market which is characteristic for project bidding, has formed. The construction companies,which want to create good benefits, have to control their cost and improve management to enhance the capacity of a

2、dapting and competing in this market. This article focuses on how to decrease cost and increase income so as to control the construction cost effectively. bidding documents should be well formulated ,which is important to a successful bidding and direct influence the success or failure of the biddin

3、g work.Because the success or failure of the bidding for the survival and development of enterprise has a direct impact, so we have a high quality, improve the bid documents of the unit, prevent invalid and successful pass mark appear, become a research topic.key : bidding drawbacks of unfair compet

4、ition countermeasuresBidding is a form of project transactions, project bidding process is to determine the successful bidder and the cost of the process and the price of the project, project bidding work of a very important link, do a good job bidding to determine the price, we can effectively cont

5、rol construction costs, and create a fair and equitable market environment, create orderly competition mechanism. Bidding in construction activities, construction enterprises in order to tender invincible works to be successful, And from the contracted projects profitable, it needs to integrate vari

6、ous subjective and objective conditions, the tender research strategy determine tender. Tender bidding strategy, including pricing strategies and skills. All of the strategies and skills from the numerous contractors bidding on the accumulated experience and objective understanding of the law and of

7、 the actual situation understanding, but also with the contractors decision-making ability and courage are closely related. Bidding documents is the general programme and play book of the bidding activity through the process of bidding. The bidding documents will specify that How to conduct each bid

8、ding work, how to dispatch bidding documents, the requirements for tenderer,how to rate and decide bidding and the procedures of bidding. Therefore, the personnel who is responsible for prepare bidding documents should first have a general view of the bidding work, include all the requirements and a

9、rrangements into the bidding documents. If meet problems that have not been considered previously, then resolve them one by one during the preparation. The course of bidding documents preparation is also the course of making bidding scheme . In another respect, bidding documents is also the legal in

10、struments. Besides relevant law and rules, the bidding documents are the common game rules that bidder,bidding agent and tenderer should subject to through the bidding. Bidding documents are the legal instruments that all the three bidding related parties should subject to, have legal force, therefo

11、re, the bidding documents -making personnel required to have the awareness and quality of legal in order to reflect the fair, just and legal requirement in the bidding documents.In building engineering bidding law enforcement and the practice of project construction supervision system on standardizi

12、ng Chinas construction market, improve the construction quality and played an active role. But in the process of implementing exist some disadvantages, needs to perfect, enrich and improve. This project bidding documents in accordance with the bidding law of the Peoples Republic of China for bidders

13、, bidding regulation, enterprise strictly, put forward to bidders professional requirements of project profile was illustrated.Nowadays in the engineering construction industry, the market which is characteristic for project bidding, has formed. The construction companies,which want to create good b

14、enefits, have to control their cost and improve management to enhance the capacity of adapting and competing in this market. This article focuses on how to decrease cost and increase income so as to control the construction cost effectively. In building engineering bidding law enforcement and the pr

15、actice of project construction supervision system on standardizing Chinas construction market, improve the construction quality and played an active role. But in the process of implementing exist some disadvantages, needs to perfect, enrich and improve. This project bidding documents in accordance w

16、ith the bidding law of the Peoples Republic of China for bidders, bidding regulation, enterprise strictly, put forward to bidders professional requirements of project profile was illustrated.The practice of project bidding purpose is to market competition of openness, fairness and justice. However,

17、due to the construction market development is not standard, management system and the experience of inadequate, architectural engineering bidding in concrete operation exist in ACTS of unfair competition, and some drawbacks. This obviously violate the bidding, the bidding process, and will lose its

18、significance for other bidder fails to bid is unjust, disturbed the bidding (project contracting market economic order, for activities), this kind of behavior must be prohibited, only in this way can we make construction engineering competitive trading activity lawfully healthy. This subject will I

19、learned and social practice, present situation and construction project bidding system is expounded, and the disadvantages of bidding for construction project with ACTS of unfair competition phenomenon and analysis of causes, and finally make corresponding preventive countermeasures.Construction cos

20、t management system, both theoretical discussion, but also need to practice innovation. Under the conditions of market economy, project cost management, competitive and orderly market for construction management services platform structures. In such a premise, the original scale and method of valuat

21、ion is inappropriate, and this needs to be reformed and improved. The spirit of the governments macro regulation and control, enterprise autonomy offer, the market will price principle, to implement the implementation specification bill of quantity. Inventory Valuation bidding activities are based o

22、n market economy mechanism, based on legal, scientific, fair, open and reasonable way to determine the winning bidder of an economic activity. Bidding is bidding activities constitute two basic aspects. The bidding activity is merely that by bidding to choose the one with the work Construction proce

23、ss capability, moderate cost, quality is excellent, short duration of construction enterprises, and this is the ultimate goal tender. I have participated in internships over the course of the project bidding, and completed over part of the calculation of quantities, combined with graduate experience

24、 in the design process, a brief analysis of the mode Quantities Call for TenderThe meaning of risk and risk characteristics of the general construction, the lowest price sealed bidding construction method produces several risks and incentives, according to their characteristics discussed the feasibi

25、lity of risk control and prevention. Comparison of engineering and engineering security risk management, insurance, similarities and differences between the two projects and benefits; construction project bidding and tendering process characteristics of human behavior is analyzed to reveal the bidde

26、rs risk appetite and behavioral characteristics with changes in the external environment change, when the default punishment is light, the bidder preference appetite for risk and default penalties, with the increase exceeds a certain value, the risk of bidders to show preference for behavior change

27、to avoid the risk of penalties, the greater the bidder biased in favor of a more risk-averse behavior, the results of the control and prevention of risk behavior of bidders has an important and practical significanceConstruction Cost Management from the quantity-one price plan model to price of sepa

28、ration volume model of the market, and gradually establish a market price-based price formation mechanism, the price of the decision in the hands of the parties involved in the market, and ultimately the allocation of resources through the market in order to realize through the market mechanism to d

29、ecide on project cost. This will standardize the construction market-competitive behavior and the promotion of project bidding mechanisms play an important role in innovation. It can be said that the implementation of the project bill of quantities is a project cost management system in our country

30、a big step forward, but also in Chinas accession to the WTO, the global construction industry a powerful tool for peer competition. With the construction of in-depth development of the market, the traditional fixed pricing model no longer suited to market-oriented economic development needs. In orde

31、r to adapt to the current project bidding by the market needs of a project cost, we must work on the existing valuation methods and pricing model for reform, the implementation of projects bill pricing. Engineering is a list of pricing model and adapt to the market economy, allowing independent cont

32、ractor pricing through market competition determine prices, with the international practice of pricing model. With the bill pricing model projects to promote, in accordance with international bidding practices is imperative. Therefore, the lowest reasonable price of the successful bidder My future i

33、s the most important evaluation methods. At this stage due to the implementation of projects bill pricing model and the problems mainly against China at this stage in the minimum reasonable price of the principles of the successful bidder, most contractors have not yet set up their own enterprises o

34、f scale, companies unable to determine the reasonable Cost. This article is a scientific and fast set reasonable cost to study the key. First, from the project cost of the basic concept, of the engineering bill pricing model under the cost structure, to accurately predict costs of the project provid

35、ed the basis, considering the average cost of the social cost to individual enterprises and the tender stage of the cost estimates. Followed through on fuzzy math and technology for smooth in-depth analysis, through close-degree, the concept of reasonable fuzzy math and exponential smoothing technol

36、ogies, construction of the project cost vague prediction model, and in accordance with the relevant information and statistics Information and experience to establish a framework structure, the comparison works Construction Cost Management from the quantity-one price plan model to price of separatio

37、n volume model of the market, and gradually establish a market price-based price formation mechanism, the price of the decision in the hands of the parties involved in the market, and ultimately the allocation of resources through the market in order to realize through the market mechanism to decide

38、 on project cost. This will standardize the construction market-competitive behavior and the promotion of project bidding mechanisms play an important role in innovation. It can be said that the implementation of the project bill of quantities is a project cost management system in our country a big

39、 step forward, but also in Chinas accession to the WTO, the global construction industry a powerful tool for peer competition. A healthy bidding system should be in accordance with the open, fair and justice and the principle of good faith, and establish a unified, open, competitive and orderly construction market. In view of the current problems existing in the bidding process, adopt regulations, and formulate and perfect the institution, strengthening process su


注意事项

本文(《医疗机构消毒技术规范》 (2).doc)为本站会员(顺腾)主动上传,文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知文库网(点击联系客服),我们立即给予删除!




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

文库网用户QQ群:731843829  微博官方号:文库网官方   知乎号:文库网

Copyright© 2025 文库网 wenkunet.com 网站版权所有世界地图

经营许可证编号:粤ICP备2021046453号   营业执照商标

1.png 2.png 3.png 4.png 5.png 6.png 7.png 8.png 9.png 10.png