文库网
ImageVerifierCode 换一换
首页 文库网 > 资源分类 > TXT文档下载
分享到微信 分享到微博 分享到QQ空间

轮机英语(2).txt

  • 资源ID:21758735       资源大小:16.09KB        全文页数:10页
  • 资源格式: TXT        下载积分:20文币
微信登录下载
快捷下载 游客一键下载
账号登录下载
三方登录下载: QQ登录 微博登录
二维码
扫码关注公众号登录
下载资源需要20文币
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
支付方式: 支付宝    微信支付   
验证码:   换一换

加入VIP,免费下载
 
账号:
密码:
验证码:   换一换
  忘记密码?
    
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

轮机英语(2).txt

1、.for Main Engine1 Please check the alignment of the shafting.2 Please check the alignment of M/E.3 Please check and accept the crankshaft deflection.4 Approval of force measurement of M.E. through bolts.5 Approval of the installation of fitted bolts.6 Approval of the fitted bolt holes.7 Approval of

2、force measurement of intermediate shaft.8 Approval of intermediate bearing clearance.9 The alignment of M/E is incorrect.10 The alignment of shafting is incorrect.11 The crankshaft deflection is over the allowance.12 Please make an adjustment.13 Explosive Pressure on M/E.14 The BHP( brake horse powe

3、r ) of M/E15 The torsional force of M/E.16 M.E. side support.17 M.E. stern support18 M.E. fastening support19 Start main engine20𶯷 Start M/E reversely21 Exhaust temperature is too high (low).22 Explosive pressure on M/E is too high(low).23 The temperature of the cooling water is too high (lo

4、w).24 The pressure of starting air is too low.25 The pressure of lub oil is too low.26 The pressure o scanvage air is too low.27 The rpm of turbocharger is too low.28 Start (Stop) the main starting valve.29 Start (Stop) the main L.O. pump.30 Start the auxiliary (anx.) blower.31 Start the main sea wa

5、ter cooling pump.32 Preheat the M/E cylinder.33 Preheat the L.O. circulating pump.34 Start (Stop) the F.O. circulating pump.35 Start (Stop) the F.O. supply pump.36 The pressure of F.O. is high (low).37 The F.O. pressure adjusting valve doesnt work.38 Change from light oil to heavy oil.39 M/E startin

6、g (reversing) test.40 Test of emergency stop.41 The engine control room control (the control from the control room)42 Local control43 The remote control from the bridge.44 Protection test of M/E flywheel trip.45 Shut-down test of F/W. high temp.46 Shut-down test of L.O. low press.47 Tooth sector of

7、high pressure oil pump.48 The advance angle is too large (small).49 The atomization of nozzle is too poor.50 The pressure of nozzle is too high (low).51 The nozzle leakage.52 The protection test of turning gear clutch.53 The governor has failed.54 Hydraulic chain tightener.55 The cylinder cover star

8、ting valve.56 The cylinder cover starting valve is too hot.57 The cylinder cover starting valve leakage.58 The cylinder oil one-way valve leakage.59 The cylinder oil one-way valve is fitted reversely.60() The inlet cylinder oil is too much (little).61 Cylinder score62 Cylinder seizing63 Cylinder kno

9、cking64 Poor combustion65 The exhaust gas is with water vapour.66 The exhaust gas is blacklight blue.67񶯣 Exhaust pipe vibration (leakage).68 Attached bracket of exhaust pipe.69 The bracket of exhaust pipe.70 The cooling water pipe leakage.71 L.O pipe leakage.72( / ) The Oil panThe circulatin

10、g L.O. tank / The inside of M/E is not clean.73 The M/E oil outlets are blocked.74 The safety of inner screw of M/E is not fitted properly.75 M.E. through bolt submission.76 M.E bottom fastening bolt submission.77 The L.O. (F.O.) filter doesnt work.򷢵for diesel engine generator1 The cleanness

11、 inside the main generator to be confirmed.2 The main generator crankshaft deflection to be confirmed.3 The installation of main generator to be confirmed.4 The protection of flywheel trip to be confirmed.5 The auto-stop function of L.O. low pressure to be confirmed.6 The auto-shop function of F.W.

12、high temperature to be confirmed.7 The load test of main generator.8100 100 load test of generator.9/ Instant load/ unload test of governor.1010050 100 to 50% instant unload test.1150 50 to nil instant unload test.12100 Nil to 50% instant load test.13 The parallel test of generators.14 The measureme

13、nt of thermal deflection (exterior pressure).15 The load test of emergency generator.16 The protection test of flywheel trip of emergency generator. 17 The auto-stop test of emergency generator F.W. high-temp.18 The auto-stop test of emergency generator L.O. low-press.19 The instant load & unload te

14、st of emergency generator governor.20 The parallel of emergency and main generators.for air compressor and air system1 The air compressor washer to be confirmed.2 The alignment of air compressor to be confirmed.3 Alarm test of F.W. high temperature.4 Alarm test of L.O. low pressure.5 The safety valv

15、e to be submitted.6 The filling test of air compressor.7() High-pressure (Low- pressure) auto-stop test of air compressor.8 Gas tightness submission of main air reservoir.9 The main air reservoir safety valve to be submitted10 Test of control air pressure-reducing valve.11 Gas tightness test of cont

16、rol air reservoir.12 The safety valve test of control air bottle.13 The effect test of dehumidifier.14 The test of service air pressure-reducing valve.15 The gas tightness test of service air reservoir.16 The safety valve of service air reservoir to be confirmed.17 The gas tightness test of aux. air

17、 reservoir.18 The aux. air bottle safety valve to be submitted.19 The safety valve test of emergency air compressor.20 The filling test of emergency air compressor. for boiler1 The tightness test of main boiler.2 Boiler pickling().3 The inside cleanness to be checked.4 The running test of boiler wat

18、er-feed pump.5 The vacuum testthe auto-shifting testof water-feed pump.6 The auto water-feed system to be confirmed.7 The safety valve of boiler F.O. pump to be submitted.8 The vacuum test of boiler F.O. pump.9 The auto-shifting test of boiler F.O. pump.10 The boiler safety valve to be confirmed.11

19、The test of boiler evaporation.12 The automation test of boiler.for shafting and steering gear system1 Please check the lighting target.2() Please check the alignment of shaftingsteering gear system.3 Please check the shaft hole.4磨 Please check the boring sizecleanness.5 The stern tube liner tighten

20、ness to be approved.6 The propeller impeller tightenness to be approved.7 Please check the rudder nil position.837 Port (Starboard) 37. Delivery expression for flushing1 The flushing submission.2 The oil temperature is too low.3 Vibrator installation.4 The oil is not clean.5 The oil is with particle

21、s.6 The oil is with slag.7 One more hour flushing.8 Please make it better.for underwater equipment1 The tightness test of hull valve.2 The tightness test of inlet valve for emergency fire pump.3 The tightness test of flushing valvevent valve.4() The tightness test of foremid-shipdraft valve.5 The ti

22、ghtness test of sounderlog.6 The seam is not good. Please reweld it.7 The seam is not smooth. Please grind it.8 Air leakage9򿪷 Please open the valve. for anchor windlass1 Please check the windlass washer.2 Please check the alignment of shafting.3Please check the windlass attached bracket.4 Th

23、e pressure of hydraulic pump is too high (low).5 The oil motor pressure is too high (low).6 The hydraulic oil temperature is high.7 The cooling water temperature is high.8 To clean the anchor windlasshydraulic pump.9 Please inspect the oil tanks.10The testing time is up.11 Theres a failure (Its abno

24、rmal).12 It doesnt work.13 The vibration is violent.14 The decibel() is too high (The noise is too loud).15 Too much/too little clearance.16 Overload17 too fast18 Please open the hydraulic pump cover.19 Please dismantle the cooler.20 Add a thermometer.21 Add a working platform.22 Add pipe fixed supp

25、orts.23 Please change hydraulic oil.24 Please renew L.O.25 Please discharge air.26 No load test of anchor windlass.27 Anchoring test.28 Add some grease.29 To renew the pressure gauge.30 To strengthen the engine seat.31 To lubricate the brake threads.32 Add some grease to clutchgears.33 Renew the oil

26、 nozzle.34 To adjust the brake clearance.35 Please check the anchor winch washers.36 Anchor winch bearing clearance.37 Anchor winch attached bracket.38 To clean the anchor winch.39粻 The washer size is wrong.40 The thickness of washers is too thin.41 No-load test.42 Pull test.43 Constant expansion te

27、st.44The anchor doesnt fit the side plate well.45 The anchor hasnt been lowered enough.46 ManualMechanicalanchoring.47 The bearing temperature is high.48 The hydraulic pump is too hot.49 The alignment is incorrect.50 The anchor hasnt been retaken enough.51 The installation of chain stopper to be acc

28、epted.52𣨷 RetakeLowerthe anchor. 53 RetakeLowerthe rope. (for steering gear)1 Please check the washers of steering gear.2 Please check the steering gear side bracket.3 The installation size of steering gear.4 Nil position of steering gear.51 Safety valve for steering gearNO.1 cylinder.6 The

29、pressure is too high (low).7 The rudder angle is out of control.8 Low oil level alarm.9 Oil leakage.10綯 Add some grease to motor.11 () Manualautosteering.12 Steering by single (twin) pump.13 The alignment of pump set to be approved.14 Pull rod bending.15 Grease pump leakage.16 The thermometer is loo

30、sened.17 The pressure gauge is damaged.180 ()35 Nil to port (starboard) 35.193535 Port 35 to starboard 35.1 The strength test for davitlife-boat.2 boat retakinglowering.3 boat lowering by remote control.4 Unhook automatically.5 Do it once again.6 The limiting switch of the appliance doesnt work.7 Th

31、e limiting switch of the appliance is not synchronous.8 Adjust the limiting switch of the appliance.9 The two-stage boat lifter doesnt start successfully.10 Please start.11 Strengthen the davit from underside.12 The safety lever is not flexible.13 Make an adjustment.14 Shaft tunnel oil leakage. .糵 f

32、or gangway, pilot ladder, rope ladder, derrick, blower etc.1 The strength test for gangwaypilot ladder.2 / The operating test for pilot ladderpilot ladder / pilot rope ladder.3 To install the handrails.4 Rope ladder winch.5 Full (No)-load.6 The no load ( strength) test for derrick.7 The safety valve

33、 test.8 The limiting switch test.9 / The strength test for rubbish derrickcargo derrick /hose derrick.10 The operating test for rubbish derrick.11 The safety equipment test for cargo derrick.12 The running testThe limiting switch testfor cargo derrick.13CO2 The CO2 tightness (operation) test.14 Plea

34、se put on the nameplates.15 The blower bearing is too hot.16 Poor maneuverability.17 Make an adjustment.18 Add some lub oil.19 To submit it in the morningafternoon. (for other items)1 The vacuum of pump to be confirmed.2 The pump pressure to be confirmed.3 The auto-shifting function of pumps to be confirmed.4 / The effect test of F.O. purifierD.O. purifier / L.O. purifier.5 The effect test of bilge separatorincinerator.6 The effect test of fire pumpemergency fire pump.7 The running test of service F.W (S.W).8 The running test of vapor pipes.9 The tightness test for high-pressure air pipes.


注意事项

本文(轮机英语(2).txt)为本站会员(公务员考试助手)主动上传,文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知文库网(点击联系客服),我们立即给予删除!




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

文库网用户QQ群:731843829  微博官方号:文库网官方   知乎号:文库网

Copyright© 2025 文库网 wenkunet.com 网站版权所有世界地图

经营许可证编号:粤ICP备2021046453号   营业执照商标

1.png 2.png 3.png 4.png 5.png 6.png 7.png 8.png 9.png 10.png