礼仪结合推销技巧培训(DOC 6页).doc
《礼仪结合推销技巧培训(DOC 6页).doc》由会员分享,可在线阅读,更多相关《礼仪结合推销技巧培训(DOC 6页).doc(6页珍藏版)》请在文库网上搜索。
1、ier A A A A B B Market Area (574 parts) CC C CD D F F F E CC C CD D A A A A B B F F F E PBS 1.PBS pass the production sequence information to the Picking station 2.The operator picks the parts according to production sequence and put in the trolley in sequence 3.The operator deliver the parts with t
2、rolley to the fit of point (1) A A A A B B (2) (3) Benefits: To save line side space and reduce operator workload handling parts complexity (Out-plant: 324 parts) 29 Color Parts Delivery Process 顏色零件之交貨程序 Body Allocation Ford Lio Ho Suppliers Send 1+6 Body Allocation at 3:30 PM E mail Multi frequenc
3、y delivery base on on-to-primer information ILVS delivery for Bumper, side skirt 30 SMART Office A A A A B B F F F E CC C C D D Fill Active Fill Active Fill Active A-01A-03 AA AAAA AAA AAA BBCC B B BBB BBB DDD DDD CCC CCC Part CPart BPart APart D DD Zone Mailbox Kan-Ban Part Process 看板供料看板供料 程序程序 Se
4、rial Number Lineside Mailbox Lineside Mailbox Operator A Operator B Workgroup Leader MH Benefits: To keep line side inventory at a minimum level, improve 5S and reduce emergency delivery 1. The operator picks the kan-ban attached in the container when he uses the first piece of the part. 2. The work
5、group leader collects the kan-ban in Line side Mailboxes and sends them to Zone Mailbox every three hours. 3. MH collects the kan-ban in Zone Mailboxes and sends them to SMART Office for sorting and putting them in different Market Mailbox. 4. The number of the kan-ban sent back to Market Mailbox ar
6、e the number of containers to be delivered to the line side Line Feeder B Market Area (764 parts) Line Feeder AMarket Mailbox A Market Mailbox A 7:20 AM 7:30 AM 7:40 AM 31 Call Parts Process 呼叫供 料 Part Number SMART No Market Address Line Side Address F7C6-5422401-AG 000122 DTL-A-02 E26-N-010 F8C6-54
7、26075-AA 005126 DTL-A-03 E27-S-020 F7C6-5467934-AB 003412 DTL-A-01 E26-N-030 Call light board A B C A B C B Call button Market Area (269 parts) Benefits: To minimize stock levels at line side and spare out spaces for the new parts of new model. 1.The operator pushes the call button to request the pa
8、rt he needs. 2.The light on the call light board for the part will be fleshing indicating the part has being requested 3.The line feeder pushes the reset button on the Reset panel reset 4.The linefeed come to market area to pick the part and deliver to the fit of point (1) (2) OnOff OnOff OnOff A B
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 礼仪结合推销技巧培训DOC 6页 礼仪 结合 推销 技巧 培训 DOC