盐城荣盛公寓策划报告.doc
《盐城荣盛公寓策划报告.doc》由会员分享,可在线阅读,更多相关《盐城荣盛公寓策划报告.doc(39页珍藏版)》请在文库网上搜索。
1、this type of operation for the safety technology. Without education and training in safety knowledge, shall not enter the construction site operations. To enter the construction site, you must wear a helmet, buckle chinstrap. Work at two meters high and must be fastened. When working at height, are
2、not allowed to throw down or up the materials and tools and other objects. Persons not engaged in electrical and mechanical, prohibited the use of mechanical and electrical equipment. Building materials and components to be tidy and secure, shall not exceed the relevant provisions. Hazardous areas s
3、hould be clearly marked, protective measures should be taken at night to set up a red light warning. In the operation, should adhere to their jobs, drunken operation is strictly prohibited. Special operations personnel (electricians, welders, boiler operators, blasters, lifting grid and pile drivers
4、 and commanding, shelf workers, machines, motor vehicle drivers, and so on) must be operating permits from the relevant sector professional training examinations, independent operation, operation focus, not to leave. Construction site prohibited to wear slippers, heels, skirt, sliding and studded sh
5、oes and barefoot, shirtless, and so on. Construction site of the scaffold (prohibition of the use of bamboo and wood materials setting), protective equipment, safety signs, warning signs, scaffolding wall may be supplemented, removed and need to be removed must be reinforced by the contractors agree
6、. Construction site of the four (openings, stairs, lift head, hole) and the five-limb (balcony, framing, roofing, run (oblique) road and unloading platforms), protective measures and clearly marked. Are not allowed to sit at the feet of . Nails should be promptly removed. Drywall cut bricks are cut,
7、 no outside chopping. Preventing broken tiles fall hurt. Tools must always be mounted after good tool bag. In the Derrick (gantry) travel; in the Derrick (gantry) increased security measures are not taken to the following cleaning mortar, concrete and other debris; hanging baskets for a long time is
8、 not allowed to stop the air; after work basket must be placed in the ground, and cut off the power and lock box. Scaffolding on the Frost, snow, mud, and building waste time cleaning. Both ends of the scaffold to fasten to prevent probe Panel. Danger of overloading the scaffold: laying per square f
9、oot scaffold distributed load shall not exceed 270KN, piled up on the scaffold standard bricks of single side three storeys high. Wall removal of dangerous scaffolding; Sat down to rest on the guard rail danger; Set, dismantling scaffolding, Derrick (gantry) high, edges, vacant jobs, such as not wea
10、ring a seat belt at risk. Upper part of the ladder to fasten, antiskid measures are required in the lower part. Upper part of the ladder to hang, and lower banding. Ladder to fasten in the Middle, lower to have a non-slip steps, are not allowed to sit on it, riding moves. Altitude: personnel engaged
11、 in the Spider-man,stavebn tm vdce mst een. een by mlo zahrnovat analzu rizik, monost nehod charakteristik a nouzovch postup, nouzov zpracovn a obsah opaten. 4, integrovan pohotovostn plny, speciln havarijn plny a mst een by mly bt mezi sebou a s ostatnmi jednotky zapojeny v nouzi, kter jsou vzjemn
12、propojeny. 5, havarijn pln by ml zahrnovat havarijn personl a organizace kontakt, nouzov rezervn seznam a dal informace. Informace by mly bt pravideln aktualizovny a zajist, e informace jsou pesn a platn. tyi, havarijn pln revize 1, Recenze pohotovostn plny pezkoumn formul a prvky pezkumu a opaten p
13、ijatch dvma zpsoby. Kdy host slou pedevm pro havarijn plny pro zznam v podob Recenze, prvek hodnocen pro nouzov hodnocen. . Kd pro porn ochranu konstrukce budov a nsk republice ny exploze nebezpen oblasti elektrick bezpenostnch pedpis a pedpis o porn ochranu design rafinaci ropy a chemickch podnik,
14、napklad poadavky na pedpisech a nazench. 2. pi provdn instalace me zpsobit por, exploze, kter sti by mly bt pln nastaven peht, petlaku, micch pstroj, alarm (zvuk a svtla). 3. kde je holav plyn (pra) me unikat , holav plyn koncentrac detekce, alarm by mla bt nastavena. 4. vechny komunikoval s holav,
15、vbun zazen s inertnm plynem, plynov penosov potrub, by mla bt nastavena zabrnit holavch a vbunch ltek do zazen, ale nemla bt samostatn zptn ventil. 5. holav plyn (pra) nastavit plamen svodi odvzduovac vvod, snadno pracovat, kde se zastavit ventily, aby pi vstupn vtrac potrub je v plamenech, peruil p
16、or plynu odvzduovac potrub ml bt nainstalovn v nejni hasicho zazen. 6. kdy dopravu holavch materil by mla odpovdat prmru potrub a stedn mrn odpor, sprvn zen prtoku, co nejvce se vyhnout statick elektiny. Antistatick opaten, jako jsou zazen, potrub, by mlo bt v souladu s technickmi pedpisy pro uzemnn
17、 design pro chemick podniky pslunch ustanoven. 7. nhl vbun petlaku nebo rychlho rozkladu vrobnch zazen nebo skladovacch zazen by mly bt vybaveny vbuchu (nevbun membrna), vvoz nonel trubice smrem k bezpenosti a aby prevence sekundrnch exploz, protiporn opaten. 8. vrobnthe principle of simplified EIA
18、of construction projects in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In
19、 the area of taxation, and settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct Government credit + business credit credit system
20、, establishment of marketization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create policy lowlan
21、ds, Highlands, integrity of service land, development land as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in
22、this sector. When there are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improv
23、e efficiency; according to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central eight rules and opposing the four winds and practicing three Suns, and check the spirit of Jiao Yulu, ideology, solicit opinions based on outsta
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 盐城 公寓 策划 报告