ProcurementandTheBankofWorld.docx
《ProcurementandTheBankofWorld.docx》由会员分享,可在线阅读,更多相关《ProcurementandTheBankofWorld.docx(242页珍藏版)》请在文库网上搜索。
1、2STANDARD BIDDING DOCUMENTSProcurement of WorksThe World BankWashington, D.C.May 2000Revised March 2002 and March 2003Principal Amendments to SBD Procurement of Works, January 1995 EditionFollowing publication of the SBD Procurement of Works, January 1995, a number of amendments were made through fo
2、ur corrigendaJune 23, 1995; June 7, 1996; September 10, 1996; and October 20, 1999. In addition, several editorial corrections and further amendments relating to the introduction of the Euro, briefing of unsuccessful bidders, corrections of bid and performance securities, and updating of the Postqua
3、lification and Disputes Settlement sections have been made. All of these amendments have been incorporated in this new May 2000 edition. The following list accounts for the principal amendments: Clauses dealing with corrupt and fraudulent practices are added (ITB 3.1 d, 20.4, 39.2; COPA 26.2, 63.5,
4、Form of Bid) The submission of an alternative Letter of Intent to execute a Joint Venture Agreement has been introduced (ITB 5.2 f) The eligibility for applying a 7 percent margin of preference in bid evaluation is restricted to domestic individual firms and joint ventures of domestic firms (ITB 5.4
5、, 32) The “one bid per bidder” revised clause clarifies the participation of a subcontractor in any bid (ITB 6) Clauses dealing with currencies of bid and payments allow for the use of the euro (ITB 15.2, 30; COPA 72.2) The bid validity period starts from the deadline for bid submission instead of f
6、rom bid opening (ITB 16.1) The requirements for bid security are modified to include bid bonds (ITB 17.2; Form of Bid Bond) The Employer notifies the name of the successful bidder to other bidders (ITB 35.3) A clause for debriefing by the Employer has been included (ITB 35.4) The disputes settlement
7、 clauses, including the disputes review methods have been simplified (ITB 38; COPA 67) The certificates and payment clause is revised to allow the Contractor a timely suspension of the Works and provides shorter times for outstanding payment certificates, in the event of suspension of Bank-financing
8、 (COPA 60.8, 69.4, 69.6) A new arbitration sub-clause is provided, including rules of procedure from among well-recognized institutions for foreign bidders (COPA 67.3.2) The form for the Performance Bank Guarantee (Conditional) is corrected to ensure consistency with COPA 10.2 (annex A, Form: Altern
9、ative 2) A footnote to the Performance Bond form clarifies the use of bonds and allows for the use of other forms of bonds (annex A, Form: Alternative 3) Section XII, Postqualification, is substantially revised in light of the Standard Prequalification Document: Procurement of Works, September 1999
10、(revised March 2000) Section XIII, Disputes Settlement Procedures, has been revised and excludes the procedure for settling disputes through an “independent” EngineerContentsIntroduction1Section I. Invitation for Bids (IFB)3Notes on the Form of Invitation for Bids3Section II. Instructions to Bidders
11、7Notes on the Instructions to Bidders7Table of Clauses8A. General10B. Bidding Documents14C. Preparation of Bids15D. Submission of Bids21E. Bid Opening and Evaluation23F. Award of Contract29Section III. Bidding Data33Notes on the Bidding Data33Section IV. Part I. General Conditions of Contract39Notes
12、 on the Conditions of Contract39PART I - GENERAL CONDITIONS51Section V. Part II: Conditions of Particular Application (COPA)103Notes on the Conditions of Particular Application103Section VI. Technical Specifications149Notes for Preparing Technical Specifications149Section VII. Form of Bid, Appendix
13、to Bid, and Bid Security153Form of Bid154Appendix to Bid156Form of Bid Security (Bank Guarantee)164Form of Bid Security (Bid Bond)166Section VIII. Bill of Quantities169Notes for Preparing a Bill of Quantities169Section IX. Form of Agreement, Forms of Performance Security, and Bank Guarantee for Adva
14、nce Payment189Form of Agreement190Forms of Performance Security and Bank Guarantee for Advance Payment192Section X. Drawings201Notes for Preparing the Drawings201Section XI. Explanatory Notes203Notes and Additional Clauses to Section IV203Section XII. Postqualification215Invitation for Bids216Sectio
15、n XIII. Disputes Settlement Procedure223Disputes Review Boards Rules and Procedures223Rules and Procedures for the Functions of the Disputes Review Expert (DRE)230Section XIV. Eligibility for the Provision of Goods, Works, and Services in Bank-Financed Procurement237IntroductionThese Standard Biddin
16、g Documents for Works (SBDW) have been prepared by the World Bank for use by borrowers in the procurement of admeasurement (unit price or rate) type of works contracts through international competitive bidding. The procedures and practices presented in this document have been developed through broad
17、 international experience. They are mandatory for use in works contracts financed in whole or in part by the World Bank (which includes the International Bank for Reconstruction and Development IBRD and the International Development Association IDA, hereinafter called “the Bank”), which are estimate
18、d to cost more than US$10 million (including contingency allowance) unless the Bank agrees to the use of other Bank Standard Bidding Documents on a case-by-case basis. (The Bank has also issued a civil law version of the SBDW as well as a SBDW for smaller contracts.) This edition of the SBDW is base
19、d on Part I of the fourth edition of the International Federation of Consulting Engineers (Federation Internationale des Ingenieurs Conseils, or FIDIC) Conditions of Contract for Works of Civil Engineering Construction (1987, reprinted 1992 with amendments), as well as changes to it resulting from t
20、he Banks experience. Section XI, Explanatory Notes, explains the differences between Part II of the Conditions of Contract, as included in this SBDW, and Part II of FIDIC.In order to simplify the preparation of bidding documents for each procurement, the SBDW groups the provisions that shall remain
21、unchanged in Section II, Instructions to Bidders, and in Section IV, Part IGeneral Conditions of Contract. Data and provisions specific to each procurement and contract shall be included in Section III, Bidding Data, in Section V, Part IIConditions of Particular Application, and in the Appendix to B
22、id included in Section VII. The documents also require Technical Specifications (Section VI), Drawings (Section X), Bill of Quantities (Section VIII), and other materials, which should be incorporated in the appropriate sections. In addition, sample forms to be used are provided where necessary.This
23、 SBDW has been prepared for bidding when prequalification has taken place. The process of prequalification shall follow the procedure indicated in Standard Prequalification Documents: Procurement of Works, issued by the World Bank. Prequalification shall be followed for all major works. Exceptionall
24、y, in the absence of prequalification, postqualification shall be followed, with prior agreement by the Bank. Postqualification procedures are covered in Section XII.A major change has been introduced with respect to the “quasi-judicial” role of the Engineer, as set forth in Subsection 67.1 of Part
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ProcurementandTheBankofWorld