吉他和弦大全指法(图) (2).doc
《吉他和弦大全指法(图) (2).doc》由会员分享,可在线阅读,更多相关《吉他和弦大全指法(图) (2).doc(32页珍藏版)》请在文库网上搜索。
1、 violently on his rope. But Mark kept on determinedly pushing up the T-bar and pulling himself up. In spite of that, he had to admit that he felt a lot better when the wind finally died down and his body touched solid rock again.It took them one day more than they had expected, but on July 26 at 1:4
2、5 in the afternoon, the crowd of people waiting on the top went wild with joy as the two heads appeared. Mark Wellman had shown that if you set your heart and mind on a goal, no wall is too high, and no dream is impossible.60. What had Mark Wellman long desired to do? A. To finish one of the most di
3、fficult rock climbs El Capitan. B. To be the first to climb El Capitan. C. To climb the highest mountain in California. D. To help his friend Peter climb El Capitan.61. How did Mark lose the use of his legs? A. He once had a fall while mountain climbing and injured his backbone. B. He fell during hi
4、s first attempt on El Capitan. C. His legs were broken by falling rocks. D. While working out in the gym, he injured his backbone.62. What was the worst problem Mark had during the climb? A. He struck against the rock and hurt his arms. B. A strong wind blew him away from the rock. C. He kept fallin
5、g several inches. D. While swaying in space, he became terrified.CLife is difficult, but it is a great truth that once we truly understand and accept it, life is no longer difficult.Most do not fully see this truth. Instead they complain about their problems and difficulties as if life should be eas
6、y. It seems to them that their difficulties represent a special kind of suffering especially forced upon them or else upon their families, their class, or even their nation.What makes life difficult is that the process of facing and solving problems is a painful one. Problems, depending on their nat
7、ure, cause in us soreness or loneliness or regret or anger or fear. These are uncomfortable feelings, often as any kind of physical pain. And since life causes an endless series of problems, life is always difficult and is full of pain as well as joy.Yet, it is in this whole process of solving probl
8、ems that life has its meaning.Problems are the serious test that tells success from failure. When we desire to encourage the growth of the human spirit, we encourage the human ability to solve problems, just as in school we set problems for our children to solve, it is through the pain of meeting an
9、d working out problems that we learn. As Benjamin Franklin said, “Those things that hurt instruct.” It is for this reason that wise people learn not to fear but to welcome the pain of problems.63. From the passage, it can be inferred that . A. nobody has problemsB. we become stronger by facing and s
10、olving the problems of life C. life is difficult because our problems bring us pain D. people like to complain about their problems64. T 渗锌炉生产线建设项目可行性研究报告中咨国联出品二二一二二一年三月目 录第一章 总 论11.1项目概要11.1.1项目名称11.1.2项目建设单位11.1.3项目建设性质11.1.4项目建设地点11.1.5项目负责人11.1.6项目投资规模11.1.7项目建设规模21.1.8项目资金来源21.1.9项目建设期限21.2项目建设
11、单位介绍31.3编制依据41.4 编制原则41.5研究范围51.6主要经济技术指标51.7综合评价6第二章 项目市场分析82.1建设地经济发展概况82.2我国渗锌炉行业发展状况分析82.3我国渗锌炉行业发展趋势分析92.4市场小结10第三章 项目建设的背景和必要性113.1项目提出背景113.2项目建设必要性分析123.2.1有利于促进我国渗锌炉工业快速发展的需要123.2.2提升技术进步,满足渗锌炉行业生产高品质产品的需要133.2.4符合中国制造2025 “三步走”实现制造强国战略目标143.2.5提升我国渗锌炉产品研发和技术创新水平的需要143.2.6提升企业竞争力水平,有助于企业长远战
12、略发展的需要143.2.7增加当地就业带动产业链发展的需要153.3项目建设可行性分析153.3.1政策可行性153.3.2技术可行性163.3.3管理可行性173.4分析结论17第四章 项目建设条件184.1地理位置选择184.2区域投资环境184.2.1区域概况184.2.2区域地形地貌条件194.2.3区域气候条件194.2.4区域交通区位条件194.2.5区域经济发展条件19第五章 总体建设方案215.1总图布置原则215.2土建方案215.2.1总体规划方案215.2.2土建工程方案225.3主要建设内容235.4工程管线布置方案235.4.1给排水235.4.2供电255.5道路设
13、计275.6总图运输方案285.7土地利用情况285.7.1项目用地规划选址285.7.2用地规模及用地类型28第六章 产品方案及技术方案306.1主要产品方案306.2产品质量指标306.3产品价格制定原则306.4产品生产规模确定306.5项目生产工艺简述316.5.1产品工艺方案选择316.5.2工艺技术流程及简述31第七章 原料供应及设备选型327.1主要原材料供应327.2主要设备选型327.2.1设备选型原则327.2.2主要设备明细33第八章 节约能源方案348.1本项目遵循的合理用能标准及节能设计规范348.2建设项目能源消耗种类和数量分析348.2.1能源消耗种类348.2.
14、2能源消耗数量分析348.3项目所在地能源供应状况分析358.4主要能耗指标及分析358.5节能措施和节能效果分析368.5.1工业节能368.5.2节水措施368.5.3建筑节能378.5.4企业节能管理388.6结论38第九章 环境保护与消防措施399.1设计依据及原则399.1.1环境保护设计依据399.1.2设计原则399.2建设地环境条件399.3 项目建设和生产对环境的影响409.3.1 项目建设对环境的影响409.3.2 项目生产过程产生的污染物419.4 环境保护措施方案419.4.1 项目建设期环保措施419.4.2 项目运营期环保措施429.5绿化方案439.6消防措施43
15、9.6.1设计依据439.6.2防范措施449.6.3消防管理459.6.4消防措施的预期效果45第十章 劳动安全卫生4710.1 编制依据4710.2概况4710.3 劳动安全4710.3.1工程消防4710.3.2防火防爆设计4810.3.3电力4810.3.4防静电防雷措施4810.4劳动卫生4910.4.1防暑降温4910.4.2卫生4910.4.3噪声4910.4.4照明4910.4.5个人防护4910.4.6安全教育及防护49第十一章 企业组织机构与劳动定员5111.1组织机构5111.2劳动定员5111.3人力资源管理5111.4福利待遇52第十二章 项目实施规划5312.1建设
16、工期的规划5312.2建设工期5312.3实施进度安排53第十三章 投资估算与资金筹措5413.1投资估算依据5413.2项目建设投资估算5413.3流动资金估算5513.4资金筹措5513.5项目投资总额5513.6资金使用和管理58第十四章 财务及经济评价5914.1销售收入及成本费用估算5914.1.1基本数据的确立5914.1.2产品成本6014.1.3平均产品利润6114.2财务评价6114.2.1项目投资回收期6114.2.2项目投资利润率6114.2.3不确定性分析6214.3经济效益评价结论64第十五章 风险分析及规避6615.1项目风险因素6615.1.1不可抗力因素风险66
17、15.1.2市场风险6615.1.3资金管理风险6615.2风险规避对策6615.2.1不可抗力因素风险规避对策6715.2.2市场风险规避对策6715.2.3资金管理风险规避对策67第十六章 结论与建议6816.1结论6816.2建议68渗锌炉项目可行性研究报告模版仅供参考或编写过程中格式借鉴使用,不作为实际项目投资使用。本报告中所发表的观点和结论仅供报告持有者参考使用;报告编制人员对本报告披露的信息不作承诺性保证,也不对各级政府部门(客户或潜在投资者)因参考报告内容而产生的相关后果承担法律责任;因此,报告的持有者和审阅者应当完全拥有自主采纳权和取舍权,敬请本报告的所有读者给予谅解第 5 页
18、第一章 总 论1.1项目概要1.1.1项目名称渗锌炉生产线建设项目1.1.2项目建设单位临武县XX有限公司1.1.3项目建设性质新建项目1.1.4项目建设地点本项目建设地址是湖南省临武县1.1.5项目负责人XX1.1.6项目投资规模本次建设项目的总投资为34800.00万元,其中,建设投资为31800.00万元(土建工程为10963.25万元,设备及安装投资15187.00万元,土地费用4600.00万元,其他费用为588.01万元,预备费461.74万元),铺底流动资金为3000.00万元。本次项目建成后,达产年可实现年产值85000.00万元,计算期内年均销售收入为70318.18万元,年
19、均利润总额13713.14万元,年均净利润10284.86万元,年上缴税金及附加为323.81万元,年均上缴增值税为2698.38万元,年均上缴所得税为3428.29万元;投资利润率为39.41%,投资利税率48.09%,税后财务内部收益率31.04%,税后投资回收期(含建设期)为4.41年。1.1.7项目建设规模本项目达产年设计生产能力:渗锌炉。本次项目占地面积80亩,总建筑面积48395.00平方米;主要建设内容及规模如下:主要建筑物、构筑物一览表工程类别工段名称层数占地面积()建筑面积()1、主要建筑工程生产车间121000.0021000.00仓储库房27000.0014000.00研
20、发办公楼7800.005600.00职工宿舍7800.005600.00职工食堂3500.001500.00配电房1280.00280.00门卫室165.0065.00其他辅助设施1350.00350.00合计30795.0048395.002、公共设施道路硬化及停车场工程116000.0016000.00绿化景观工程16500.006500.001.1.8项目资金来源本项目总投资资金34800.00万元人民币,资金来源为项目企业自筹。1.1.9项目建设期限本项目分二期建设,一期工程建设从2020年5月1日至11月1日,计6个月;二期工程建设从2021年5月1日至11月1日,计6个月;工程建设
21、工期共计12个月。1.2项目建设单位介绍公司的主导产品为:圆压平电脑烫金机、高精密高速自动模切机、高精密自动平压平电脑全息烫印模切机以及高速自动糊折盒机等。公司产品多次参加国内及德国杜塞尔多夫、美国芝加哥、英国伯明翰等国际印刷展,深受国内外用户及业界好评。经过10余年的发展,公司已发展成为国内领先的印后设备制造企业,产品遍布全国并出口至美国、英国、德国、瑞士、法国、日本、俄罗斯、西班牙、韩国、澳大利亚、巴西等二十多个国家和地区。公司自成立以来一直致力于高新技术及其产品的研究和生产,经过不断的完善和发展,公司现已拥有一支有较强的新技术研发能力的技术队伍以及一大批具有先进技术水平的生产设备。新产品
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 吉他和弦大全指法图 2 吉他 和弦 大全 指法